Home United Kingdom
  Solutions
Products
Support & Service
News
About us
Contact   United Kingdom
 
Solutions  
 
Aerospace
 
 
Agriculture.
 
 
Asset & Facilities Mgmt
 
 
Automotive
 
 
Building & Construction
 
 
Cadastral
 
 
Disaster & Emergency Management
 
 
Engineering
 
 
 Airports and Stadiums
 
 
 Bridges
 
 
 Harbours and Docks
 
 
 Large Building Construction
 
 
 Plants & Refineries
 
 
 Railways
 
 
  Monitoring Toronto’s Union Station
 
 
  Accurate GNSS Everywhere with SmartNet
 
 
  Precision Concrete for 300 kmh Trains
 
 
  One Hundred and One Hours
 
 
  Olympic High Speed
 
 
  57 km long and in the right Place
 
 
  Documenting a Subsea Tunnel
 
 
  City-Tunnel Leipzig
 
 
  Automated 3D control for ballasting works
 
 
  High precision railway ballast construction
 
 
  Australian rail survey
 
 
  West Coast Main Line
 
 
  High Speed Railway
 
 
  Vancouver SkyTrain
 
 
  Vereina Tunnel - Switzerland
 
 
  Moving a railway bridge
 
 
  Tunnel profiles in subways
 
 
  Railway rapid transport
 
 
 Roads
 
 
 Sites
 
 
 Tunnel surveys
 
 
 Water Supplies
 
 
Forensics & Public Safety
 
 
General Industry
 
 
Mining & Exploration
 
 
Monitoring
 
 
Other
 

Precision Concrete for 300 kmh Trains

Reporter 62
Modern railway infrastructure often presents technical challenges for developers and builders alike, since high-speed railway tracks have to withstand enormous forces and vibrations. This also applies to the 123 km section between Erfurt and Leipzig/Halle, which forms part of the new Intercity Express (ICE) link between Munich and Berlin. Deutsche Bahn AG customers will eventually be travelling along this stretch at speeds of up to 300 km/h (190 mph), completing their journeys to or from the German capital in four rather than the current six hours. The ICE will travel over six major bridges and through three tunnels, the longest being the twin-tube Finne Tunnel with a length of almost seven kilometers. The precise control of the concrete paver that provided the bed for the subsequent track construction through the tunnel was accomplished with total stations and the 3D machine control system PaveSmart 3D from Leica Geosystems.

 
 

Products

Paving Solutions
Application Overview  more
Engineering & Monitoring TPS
Product Overview Total Stations  more